Water Treatment Facility Construction Services
City of Montpelier, Vermont
For over two decades the City of Montpelier planned construction of a surface water treatment facility to produce potable drinking water from the Berlin Pond source. After numerous site relocations during preliminary design, the construction of a state of the art 4.0 million gallons per day water treatment facility was initiated in 1998.
D&A provided construction consulting services during the 620 calendar day construction period, which concluded in June 2000. These services included:
Engineering Services Negotiations
On-Site Construction Observation
Process Engineering Consultation
Operator Training
Facility Startup/Demonstration of Operational Readiness
Operation and Maintenance Manual Development
Source Protection Plan Development
Ongoing Operational Assistance