Water Treatment Facility Upgrade
Brattleboro, Vermont

The Brattleboro, Vermont Pleasant Valley Reservoir Water Treatment Facility was
originally constructed in 1988. Since that time the facility has experienced
difficulties with coagulation and operation of the adsorption clarifier/filters.
The Town of Brattleboro initiated an evaluation of the facility in 2000 to
identify deficiencies and recommend improvements. As a result of that evaluation
the following improvements were included in a comprehensive facility upgrade:
Increase raw water pipe diameter for additional coagulation contact time.
Building addition for equipment.
Addition of a fourth clarifier/filter unit.
Addition of filter rinse provisions.
Building addition for air handling equipment, storage and maintenance.
Modification to existing lagoons.
Construction of freezing/drying bed.
Controls, instrumentation and SCADA replacement.
Wide Area Network.
|
Key Features
|